Chandrayaan-3 being prepared for Friday's launch. Photo: Isro
Chandrayaan-3 being prepared for Friday's launch. Photo: Isro
Chandrayaan-3 being prepared for Friday's launch. Photo: Isro
Chandrayaan-3 being prepared for Friday's launch. Photo: Isro

Chandrayaan-3: When will lunar mission launch and why does India want to explore the Moon?


Taniya Dutta
  • English
  • Arabic

India is ready to launch its ambitious third lunar mission, Chandrayaan-3, on Friday as it plans to send a rover to the surface of the Moon after its previous mission, Chandrayaan-2, crashed as it was landing.

Chandrayaan means Moon-vehicle or lunar spacecraft in Hindi.

The Indian Space Research Organisation (Isro) – the country’s national space agency – is to launch the 3,900kg spacecraft from the Satish Dhawan Space Centre in Sriharikota, an island in the Bay of Bengal.

The Geosynchronous Satellite Launch Vehicle Mark III, the vehicle carrying the spacecraft Chandrayyan 3, will take off from the launch station at 2.35pm local time.

How important is the Chandrayaan-3 mission?

The success of the mission is viewed as a demonstration of India’s spacefaring ambitions. It will be the first spacecraft to land on the South Pole of the Moon, so far unexplored by human beings, in attempts to provide valuable scientific data on Earth.

Nasa says the mission will make numerous scientific measurements on the surface and from orbit.

The lunar mission is a follow-up to Chandrayaan-2, which was launched in September 2019 but crashed on the Moon’s surface when the soft-landing attempt failed because of issues with the onboard computer and propulsion system.

The mission is primarily a landing and roving mission, unlike the previous lunar mission which carried an orbiter.

The budget for the Chandrayaan-3 mission is 6.15 billion rupees (about $74 million).

The cost of the Chandrayaan-2 mission was about 8.5 billion rupees ($124 million) while the first mission, Chandrayaan-1, cost 5.41 billion rupees ($79 million).

Chandrayaan-2 lifts off from Sriharikota in July 2019. The lander crashed trying to touch down on the Moon. AFP
Chandrayaan-2 lifts off from Sriharikota in July 2019. The lander crashed trying to touch down on the Moon. AFP

What is the objective of Chandrayaan-3?

“Chandrayaan-3 consists of an indigenous lander module, propulsion module, and a rover with an objective of developing and demonstrating new technologies required for interplanetary missions,” Isro said.

The main objective of Chandrayaan-3 is to demonstrate a safe and soft landing on the lunar surface as well as the capability to place a rover on the Moon to conduct scientific experiments.

This is India’s second mission to the Moon's South Pole. It launched Chandrayaan-1 in 2008, which intentionally crashed into the lunar surface and led to the discovery of frozen water.

While Chandrayaan-2's aim was to explore the areas combining the exosphere – the very thin and tenuous atmosphere of the moon – Chandrayaan-1 and 3 were set to explore the South Pole.

Launch preparation for Chandrayaan-3. Photo: Isro
Launch preparation for Chandrayaan-3. Photo: Isro

Chandrayaan-3's components

The spacecraft is made up of a lander/rover and a propulsion module. The lander/rover will be similar to that used on Chandrayaan 2, with improvements to help ensure a safe landing.

It will be carried to lunar orbit by the propulsion module, which will remain in orbit around the Moon and act as a communications relay satellite.

The rover is expected to land on the Moon on either August 23 or 24, while Chandrayaan-3 will enter lunar orbit approximately a month after its launch.

The vehicle is made up of the following components.

Lander module: A space vehicle designed to land on the surface of the planet or moon. It has the capability to soft land at a specified lunar site and activate the rover, which will carry out chemical analysis of the surface during the course of its mobility. It is box-shaped, with four landing legs and four landing thrusters of 800 newtons each.

Propulsion module: This unit carries the lander and rover from launch vehicle injection to the final 100km lunar orbit.

It includes a payload – an electronic subsystem or experiment board comprising sensors that monitor factors such as temperature, humidity and radiation levels (called spectro-polarimetry of habitable planet Earth) – to study the spectral and polarimetric measurements of Earth from lunar orbit.

Lander payloads: The lander will carry payloads such as Chandra’s Surface Thermophysical Experiment to measure thermal conductivity and temperature. It also has an instrument for lunar seismic activity, which measures the seismicity, or frequency of earthquakes, around the landing site.

The lander includes the Langmuir Probe, used to estimate the electron temperature and electron plasma density in the ionosphere – where Earth's atmosphere meets space.

Rover payloads: The rover is a device designed to explore planetary surfaces. The rover will carry loads such as an alpha particle X-ray spectrometer and laser-induced breakdown spectroscope for establishing the elemental composition near the landing site.

Isro is using several advanced technologies in the lander, including altimeters, velocimeters and an accelerometer. There is also a navigation, guidance and control system, and a hazard detection and avoidance camera to ensure the safety of the vehicle when landing.

The Sand Castle

Director: Matty Brown

Stars: Nadine Labaki, Ziad Bakri, Zain Al Rafeea, Riman Al Rafeea

Rating: 2.5/5

Greatest of All Time
Starring: Vijay, Sneha, Prashanth, Prabhu Deva, Mohan
Director: Venkat Prabhu
Rating: 2/5
The lowdown

Bohemian Rhapsody

Director: Bryan Singer

Starring: Rami Malek, Lucy Boynton, Gwilym Lee

Rating: 3/5

UAE currency: the story behind the money in your pockets
Cryopreservation: A timeline
  1. Keyhole surgery under general anaesthetic
  2. Ovarian tissue surgically removed
  3. Tissue processed in a high-tech facility
  4. Tissue re-implanted at a time of the patient’s choosing
  5. Full hormone production regained within 4-6 months
COMPANY%20PROFILE
%3Cp%3E%3Cstrong%3ECompany%20name%3A%3C%2Fstrong%3E%20Revibe%20%0D%3Cbr%3E%3Cstrong%3EStarted%3A%3C%2Fstrong%3E%202022%0D%3Cbr%3E%3Cstrong%3EFounders%3A%3C%2Fstrong%3E%20Hamza%20Iraqui%20and%20Abdessamad%20Ben%20Zakour%20%0D%3Cbr%3E%3Cstrong%3EBased%3A%3C%2Fstrong%3E%20UAE%20%0D%3Cbr%3E%3Cstrong%3EIndustry%3A%3C%2Fstrong%3E%20Refurbished%20electronics%20%0D%3Cbr%3E%3Cstrong%3EFunds%20raised%20so%20far%3A%3C%2Fstrong%3E%20%2410m%20%0D%3Cbr%3E%3Cstrong%3EInvestors%3A%20%3C%2Fstrong%3EFlat6Labs%2C%20Resonance%20and%20various%20others%0D%3C%2Fp%3E%0A
BRAZIL SQUAD

Alisson (Liverpool), Daniel Fuzato (Roma), Ederson (Man City); Alex Sandro (Juventus), Danilo (Juventus), Eder Militao (Real Madrid), Emerson (Real Betis), Felipe (Atletico Madrid), Marquinhos (PSG), Renan Lodi (Atletico Madrid), Thiago Silva (PSG); Arthur (Barcelona), Casemiro (Real Madrid), Douglas Luiz (Aston Villa), Fabinho (Liverpool), Lucas Paqueta (AC Milan), Philippe Coutinho (Bayern Munich); David Neres (Ajax), Gabriel Jesus (Man City), Richarlison (Everton), Roberto Firmino (Liverpool), Rodrygo (Real Madrid), Willian (Chelsea).

David Haye record

Total fights: 32
Wins: 28
Wins by KO: 26
Losses: 4

Specs

Engine: Dual-motor all-wheel-drive electric

Range: Up to 610km

Power: 905hp

Torque: 985Nm

Price: From Dh439,000

Available: Now

MANDOOB
%3Cp%3EDirector%3A%20Ali%20Kalthami%3C%2Fp%3E%0A%3Cp%3EStarring%3A%20Mohammed%20Dokhei%2C%20Sarah%20Taibah%2C%20Hajar%20Alshammari%3C%2Fp%3E%0A%3Cp%3ERating%3A%204%2F5%3C%2Fp%3E%0A%3Cp%3E%3C%2Fp%3E%0A
COMPANY%20PROFILE
%3Cp%3E%3Cstrong%3EName%3A%20%3C%2Fstrong%3ESmartCrowd%0D%3Cbr%3E%3Cstrong%3EStarted%3A%20%3C%2Fstrong%3E2018%0D%3Cbr%3E%3Cstrong%3EFounder%3A%20%3C%2Fstrong%3ESiddiq%20Farid%20and%20Musfique%20Ahmed%0D%3Cbr%3E%3Cstrong%3EBased%3A%20%3C%2Fstrong%3EDubai%0D%3Cbr%3E%3Cstrong%3ESector%3A%20%3C%2Fstrong%3EFinTech%20%2F%20PropTech%0D%3Cbr%3E%3Cstrong%3EInitial%20investment%3A%20%3C%2Fstrong%3E%24650%2C000%0D%3Cbr%3E%3Cstrong%3ECurrent%20number%20of%20staff%3A%3C%2Fstrong%3E%2035%0D%3Cbr%3E%3Cstrong%3EInvestment%20stage%3A%20%3C%2Fstrong%3ESeries%20A%0D%3Cbr%3E%3Cstrong%3EInvestors%3A%20%3C%2Fstrong%3EVarious%20institutional%20investors%20and%20notable%20angel%20investors%20(500%20MENA%2C%20Shurooq%2C%20Mada%2C%20Seedstar%2C%20Tricap)%3C%2Fp%3E%0A
Election pledges on migration

CDU: "Now is the time to control the German borders and enforce strict border rejections" 

SPD: "Border closures and blanket rejections at internal borders contradict the spirit of a common area of freedom" 

Timeline

2012-2015

The company offers payments/bribes to win key contracts in the Middle East

May 2017

The UK SFO officially opens investigation into Petrofac’s use of agents, corruption, and potential bribery to secure contracts

September 2021

Petrofac pleads guilty to seven counts of failing to prevent bribery under the UK Bribery Act

October 2021

Court fines Petrofac £77 million for bribery. Former executive receives a two-year suspended sentence 

December 2024

Petrofac enters into comprehensive restructuring to strengthen the financial position of the group

May 2025

The High Court of England and Wales approves the company’s restructuring plan

July 2025

The Court of Appeal issues a judgment challenging parts of the restructuring plan

August 2025

Petrofac issues a business update to execute the restructuring and confirms it will appeal the Court of Appeal decision

October 2025

Petrofac loses a major TenneT offshore wind contract worth €13 billion. Holding company files for administration in the UK. Petrofac delisted from the London Stock Exchange

November 2025

180 Petrofac employees laid off in the UAE

THE BIO

Born: Mukalla, Yemen, 1979

Education: UAE University, Al Ain

Family: Married with two daughters: Asayel, 7, and Sara, 6

Favourite piece of music: Horse Dance by Naseer Shamma

Favourite book: Science and geology

Favourite place to travel to: Washington DC

Best advice you’ve ever been given: If you have a dream, you have to believe it, then you will see it.

Key developments

All times UTC 4

Updated: July 13, 2023, 3:23 AM